What is permitted development?
Permitted development rights let you make certain changes to a house without applying for planning permission, as long as you stay within set size limits. They apply to houses, not flats or maisonettes, and they can be removed in some places, so it's always worth checking first.
Single-storey rear extensions
- Up to 3 m deep on a semi-detached or terraced house, or 4 m on a detached house, measured from the original rear wall
- No higher than 4 m
- If within 2 m of a boundary, the eaves can't be higher than 3 m
Under the larger home extension scheme you can go up to 6 m (semi or terrace) or 8 m (detached). You notify the council, neighbours get 21 days to comment, and the council only looks at the effect on neighbours if someone objects.
Side extensions
- Single storey only, with a maximum height of 4 m
- No wider than half the width of the original house
- Not allowed beyond a side wall that faces a road
Two-storey rear extensions
- No more than 3 m deep
- At least 7 m from the rear boundary
- Upper-floor side windows must be obscure-glazed and fixed shut below 1.7 m
- The roof pitch should match the house as far as practical
Rules that apply to every extension
- Extensions and outbuildings together can't cover more than half the land around the original house. Earlier extensions count.
- No extension can go forward of the front of the house facing a road.
- "Original house" means as first built, or as it stood on 1 July 1948, so previous extensions use up some of your allowance.
When you still need planning permission
- In conservation areas, National Landscapes (like the North Devon Coast) and National Parks, side and two-storey extensions aren't permitted development, and the larger home extension scheme isn't available
- Listed buildings need listed building consent
- Where the council has removed permitted development rights, for example by a planning condition or an Article 4 direction
Two things people often miss
Building regulations still apply. Permitted development only covers planning. Every extension still needs building regulations approval for structure, insulation, drainage and fire safety.
Get a Lawful Development Certificate. It's an optional application to the council confirming your extension is permitted development. It costs much less than planning, and gives you proof when you come to sell.
Fixed-price planning and build packages
We price design, planning, building regulations and the build as one fixed package, agreed up front from a clear specification. No nasty surprises: the price only changes if you choose to change the job, and we agree any change with you first. How our packages work.
Planning an extension?
We can check what your house allows, handle the drawings and building regulations, and build it. These rules are a simplified summary for England, so always check the details for your property. More on our extensions.
Quick answers
How far can I extend without planning permission?
Usually 3 m for a semi or terrace and 4 m for a detached house, single storey. Up to 6 m or 8 m is possible through the larger home extension notification process.
Do I need building regulations for a permitted development extension?
Yes. Permitted development only removes the need for planning permission. Building regulations approval is still required.
What is a Lawful Development Certificate?
An optional certificate from the council confirming your project is permitted development. It is useful proof when selling the house.
Talk to us about your project
Call or text any time, or email us. We're happy to pop round for a no-obligation chat.
We work within roughly 15 miles of our base in Tawstock, including Barnstaple, Bideford, Braunton, Great Torrington, South Molton, Ilfracombe, Fremington, Instow, Northam, Westward Ho!, Appledore, Bishop's Tawton, Swimbridge, Landkey, Chittlehampton, Atherington, High Bickington and Chulmleigh.